Technical blog
Design criteria for industrial data, IT/OT integration and Mine-to-Mill analytics. Technical notes by Renzo Gallegos.
Subscribe via RSSDesigning a KPI Catalog for an Integrated Operations Center
Define operational decisions, metric ownership, denominators and change control so an IOC compares mine and plant indicators without hiding conflicting definitions.
Published: 4 min readAnalyzing Mining Equipment Delays with PostgreSQL and Python
Build a reproducible delay dataset: reconcile FMS events, clip reporting windows, detect overlaps and explain coverage before ranking mining equipment delays.
Published: 4 min readStructuring a Digital Transformation Roadmap for Mining
Turn operational opportunities into a sequenced mining technology portfolio using evidence, risk, feasibility, economic assumptions and explicit investment gates.
Published: 4 min readHow to Structure PI Asset Framework for a Mining Operation
Design criteria for assets, templates and metadata in PI AF, keeping physical identity distinct from operational context and analytical calculations.
Published: 4 min readData Quality Rules for Industrial Historians and Mining Analytics
Separate source quality, physical plausibility, freshness and coverage; preserve traceability when historian values feed mining dashboards and analytical datasets.
Published: 4 min readData Architecture for Mine-to-Mill Analytics
Integrate FMS, historian and relational data while preserving context, quality and traceability before building mine and plant analytics.
Published: 3 min read